- Nhon Hoi Industrial Park - Park A is supplied with electricity from the national grid via a 220KV line from Phu Tai to a 220/110KV substation with a capacity of 2×125 MVA in Nhon Hoi EZ.
- The 110 KV line from 220/110KV station to 110/22KV substation with capacity of 2×63 MVA located in the industrial park.
- Transformer station will be installed in the factory in accordance with investor’s need by PC Binh Dinh.
- The investor signs a direct contract with Binh Dinh Power Company to install a power supply transformer station.
- Electricity prices according to regulations of the Ministry of Industry and Trade.
The power supply process is carried out according to the diagram below: