- Nhon hoi A industrial park has a water supply system to each factory through a high pressure water pumping station with a capacity of 24,000 m3 per day (phase 1) and 64,000 m3 per day (phase 2).
– The investor signs a water supply service contract with Saigon - Nhon Hoi Industrial Park Corporation.
– The water supply process is carried out according to the diagram below: